Field Reports
Field Report 1 - Four Foot Repair - 16” Gas Transmission Line
Field Report 2 - Dickenson Bayou Repair
Field Report 3 - 16” OD Gas Transmission Bend Repair
Field Report 4 - 4” Transition Needing Corrosion Barrier
Field Report 5 - 3” Riser Coating Repairs Ventura Platform
Field Report 6 - Gas Processing Plant Gouge Repair
Field Report 7 - 14” OD Natural Gas Line—35-65% Wall Loss
Field Report 8 - Flare Line Repair
Field Report 9 - Puerto Rico Municipal Water Line
Field Report 10 - Pipeline Terminal Transition Zone Repair
Field Report 11 - Airport HVAC Repair
Field Report 12 - Pipe Sock Repair
Field Report 13 - 12.75” Gas Transmission Repair, 25% Wall Loss
Field Report 14 - SplashGard Underwater Repair 25 meters
6” Diameter Submerged pipeline, 60 feet below sea level, 40° F
Case Studies
Case Study 1 - Sha Tin Fresh Water Pump Stations
Case Study 2 - Shek Kong Water Line |